Mahankal Rural Municipality

Date: 2023
Client: Mahankal Rural Municipality
length: 15km

Detail Survey Work of For the Preparation of Detail Project Report of Dhungkharkharka-Chyamrangbeshi-Sukumfedi-Phaparbari Road Section

Information

The Detailed Survey Work for the Preparation of the Detailed Project Report (DPR) of the Dhungkharkharka-Chyamrangbeshi-Sukumfedi-Phaparbari Road Section involves a thorough investigation to ensure accurate design and planning. It begins with a reconnaissance survey, where the survey team assesses the terrain and road conditions, identifying any obstacles such as steep gradients, rivers, or settlements that could affect the road alignment. This is followed by a topographic survey, which uses advanced tools like GPS and drones to capture detailed information on the ground elevations, contours, and physical features. This helps in creating contour maps and identifying areas that may require cut-and-fill operations for proper road construction. Additionally, a geotechnical survey is conducted to investigate the soil and subsurface conditions, ensuring the road's foundation is designed to withstand erosion, landslides, or other natural hazards.